Apr 102014
 

Date
12 & 13 April 2014

Start time :
9.30 – 10 at the Barn at Colt Hill, Odiham

Work Site
The Barn at Colt Hill

Tasks
Saturday Morning

  • All noisy jobs, e,g shovelling road stone (which has been taken to Colt Hill in Fly II, chain sawing up the tree trunks then remove for logs
  • Move the 2 half bags of road stone inside our fencing, or us them

Saturday p.m. & Sunday

  • Put the rest of the tree root & the piles of root and wood in the barge to go to Lodge Farm.
  • Bring the barge back to Lodge Farm from North Warnborough
  • Move the bag of sand inside our fencing
  • Move the unused piles inside the fencing
  • Replace the pub notice board
  • Finish our last bit of fence panel and hang the gate.
  • Level the ground outside our fence and lay turf.
  • Take our  metal fence down.

Please let me know if you can come.

Janet

Top